Size guide
Which dumpster size do I need?
Match your project to a bin. Most home projects fit a 20 yard. Heavy material like concrete and dirt goes in a smaller bin because weight, not space, is the limit.
Sizes at a glance
| Size | Holds about | Tons included | Heavy material | From |
|---|---|---|---|---|
| 10 yard | 4 pickup loads | 1 | Concrete, stone, brick, dirt, road base | $290 |
| 15 yard | 6 pickup loads | 2 | Concrete, stone, brick, dirt, road base | $380 |
| 20 yard | 8 pickup loads | 2 | Concrete, stone, brick (no dirt) | $400 |
| 30 yard | 12 pickup loads | 3 | Not allowed | $510 |
| 40 yard | 16 pickup loads | 4 | Not allowed | $620 |
Prices are Flat Rate with tons included, plus applicable fees. Extra tons $75, extra days $10. All prices
Size by project
| Project | Size |
|---|---|
| Bathroom remodel | 10 yard |
| Garage, attic or small basement cleanout | 10 yard |
| Concrete, brick, pavers or block | 10, 15 or 20 yard; 10 tons max |
| Dirt or road base | 10 or 15 yard, about half full |
| Deck or fence removal | 15 yard |
| Kitchen remodel or flooring replacement | 15 or 20 yard |
| Roof tear-off (single home) | 20 yard |
| Whole-house cleanout or multi-room remodel | 20 yard |
| New construction or home addition | 30 yard |
| Estate cleanout or large property cleanup | 30 yard |
| Major demolition or large commercial cleanout | 40 yard |
Landscapers hauling sod, rock and yard debris: see same-day landscaping haul-off. Contractors with ongoing work: see the Bin Drop Program.
Price your dumpster
Tips for picking a size
- Stuck between two sizes? Go one up. A bin that fills early means a $99 swap.
- Keep heavy material separate. Concrete, dirt and stone fill the tons long before they fill the bin.
- Never load above the top edge. We can't haul an overloaded bin safely.
- Measure your drop spot. Tell us about tight driveways, gates or soft ground when you book.
Before you load
Some items can't go in any dumpster, and a few cost $50 each because the disposal site charges for them. See what can go in a dumpster.
Want the numbers on cost? Read how much a dumpster rental costs in St. Augustine.
Size questions
What size dumpster do I need?
Most homeowners choose a 20 yard: it fits a kitchen remodel, a roof tear-off or a whole-house cleanout, about 8 pickup truck loads with 2 tons included. Small jobs and heavy material like concrete fit a 10 yard. New construction and estate cleanouts usually need a 30 yard.
How many pickup truck loads fit in each dumpster?
About 4 in a 10 yard, 6 in a 15 yard, 8 in a 20 yard, 12 in a 30 yard, 16 in a 40 yard.
What if I pick a size that is too small?
Call us and we'll swap the full bin for an empty one for $99. All tons for the job are added up at the end and your included tons come off the total. Never load above the top edge: an overloaded bin costs $250 plus tonnage to offload.
Which dumpster sizes can take concrete or dirt?
Concrete, stone and brick go in a 10, 15 or 20 yard bin. Dirt and road base go in a 10 or 15 yard bin, filled about half full. Every heavy load is capped at 10 tons. The 30 and 40 yard bins are for bulky, lighter debris only.
Is weight or size more important?
Both. The bin size sets how much fits; the included tons set what the price covers. Heavy debris like shingles, tile and plaster uses up tons quickly. Extra tons are $75 each.